Skip to Content
Drainage Analysis
Stormwater runoff location and volume.
Rain Garden Design
Design including grading, plantings, and soil type
Sanitary Sewer Design and Permitting
Connection between building and municipal line or building and septic sewer/infiltration areas.
Bulkhead Design Layout and Permitting
The design of ocean waterfront property and securing a defined edge by way of treated wood piles or synthetic materials for longevity.
Dock Design and Permitting
Layout of dock and piers and permitted through local authority.
Driveway Access Design and Permitting
Driveway design using owner desired material and permitted though local agency with plans and application.
Lot Division or Joining
Plan development signed and sealed with an application to local authorities to split a lot or join lots together.
Deck Permitting
The design and application of a deck to local authorities. Starting with design and hanging off.
Zoning/Change of Use
A plan set and application required for submittal to local authorities to change the current zone of a property.
Variance Application
An allowance that deviates from the current required code. This may be for setback from property line, parking layout, driveway route, deck height or size, etc.
Survey Services
  • Easement Preparation: The language explaining a specific area for access through another property.
  • Record Survey: The review of historical lot sales to explain the property owned.
  • Subdivision Platting: Layout and application pertaining to divided one lot into multiple lots.
  • Section Corner Recovery and Monumentation
  • Aerial Mapping: Using drones to provide site information which are correlated with known ground features.
  • Tree Surveys: Review of tree type and circumference and located in field.
  • Bathymetric: Detailed items including physical features and characteristics.
  • ALTA: The design and application of a deck to local authorities. Starting with design and hanging off to contractor to build the deck.
  • Boundary: Connected property lines using known points in the field or previous deeds.
  • Construction Staking: using engineering designs to coordinate building anything outside. This may include underground items such as sanitary sewer placement and water mains to above ground items like building corners and adjacent pavement edges.
  • Right-of-Way (ROW): Access location between two properties. Typically used for utilities or driveways.
  • Topographic: Information for elevation data to understand angulations in ground surface.
  • Title: Detailed investigation of land parcel that correlates land features to understand the full extents of the owned land.

You may share a link to this page on any of the sites listed below or send link via email:

Get In Touch

We look forward to hearing about your project and how we can help you achieve your goals.

* indicates a required field

This website uses cookies to improve user experience. By using our website you consent to all cookies in accordance with our Terms & Conditions.

Accept & Hide Message